University of Minnesota
Controller's Organization: Purchasing Services
http://purchasing.umn.edu
612-624-2828
myU OneStop


Controller's Office > Purchasing Services

Department of Purchasing Services

Project Advertisements

The Projects noted on this page are currently available to bid or propose. To access the Request for Proposal (RFP) or Request for Bid (RFB) information, please click on the appropriate type of service below to find the Project:

  • Construction Contractor Advertisements
  • Design (Architect, Engineer, and Consultant) Advertisements
  • Once a Project has passed its due date, the Project documents will be moved to the Project Archives. If you cannot find a particular Project that you feel should be available on this page, simply send us an e-mail with this Project information.

    Construction Contractor Advertisements

    The Construction Contractor RFP and RFB documents are accessible below.
    Information is sorted by Project Number.

    Project # 01-444-15-1750: Parking Structure and Lot Lighting Retrofit - 2015 - Labor Only

  • Issue Date: Feburary 18, 2015
  • Due Date: March 5, 2015
  • Request for Proposal (DOC; 349 K)
  • RFP Instructions, Requirements, and Rights (PDF; 273 K)
  • Prevailing Wage Rates (ZIP; 702 K)
  • Project Manual & Drawing (PDF; 24.4 M)
  • Pre-Proposal Meeting Sign-in (PDF; 168 K; Released 02-24-15)
  • Addendum 1 (PDF; 63 K; Released 02-24-15)
  • Purchasing Contact: Chip Foster (foste048@umn.edu)

    Project # 01-147-14-1819: Weaver-Densford Hall - 2nd Floor Nursing

  • Issue Date: February 20, 2015
  • Due Date: March 16, 2015
  • Request for Proposal (DOC; 311 K)
  • RFP Instructions, Requirements, and Rights (PDF; 281 K)
  • Prevailing Wage Rates (ZIP; 478 K)
  • Drawings (PDF; 3.7 M)
  • Specifications (PDF; 2.4 M)
  • Hazardous Materials Report (PDF; 830 K)
  • Addendum 1 (ZIP; 12.8 M; Released 03-02-15)
  • Purchasing Contact: Kevin Sullivan (sull0198@umn.edu)

    Project # 03-502-15-1091: UMD Oregon Creek Water Damage

  • Issue Date: February 13, 2015
  • Due Date: March 9, 2015
  • Request for Proposal (DOC; 318 K)
  • RFP Instructions, Requirements, and Rights (PDF; 281 K)
  • Prevailing Wage Rates (ZIP; 478 K)
  • Table D-1 Project Cost and Staffing Matrix (XLS; 32 K)
  • Scope Background (PDF; 287 K)
  • Pre-Proposal Meeting Sign-in (PDF; 2.5 M; Released 02-24-15)
  • Addendum 1 (PDF; 343 K; Released 02-25-15)
  • Addendum 2 (PDF; 11 K; Released 02-27-15)
  • Purchasing Contact: Kevin Sullivan (sull0198@umn.edu)

    Project # 03-541-15-1544: UMD Griggs Hall A-B to K-L Re-Roof

  • Issue Date: February 9, 2015
  • Due Date: March 5, 2015
  • Request for Proposal (DOC; 346 K)
  • RFP Instructions, Requirements, and Rights (PDF; 281 K)
  • Prevailing Wage Rates (ZIP; 67 K)
  • Drawings (PDF; 3.9 M)
  • Specifications (PDF; 47.8 M)
  • Addendum 1 (ZIP; 647 K; Released 02-12-15)
  • Pre-Proposal Meeting Sign-in (PDF; 24 K; Released 02-23-15)
  • Addendum 2 (PDF; 400 K; Released 02-27-15)
  • Addendum 3 (DOC; 17 K; Released 02-27-15)
  • Purchasing Contact: Denis Larson (dpl@umn.edu)

    Project # 22-888-13-1595A: Arboretum - Bee Discovery and Pollinator Center

  • Issue Date: February 20, 2015
  • Due Date: March 13, 2015
  • Request for Proposal (DOC; 315 K)
  • RFP Instructions, Requirements, and Rights (PDF; 281 K)
  • Prevailing Wage Rates (ZIP; 478 K)
  • Table D-1 Project Cost and Staffing Matrix (XLS; 32 K)
  • Predesign Report (PDF; 10.5 M)
  • Pre-Proposal Meeting Sign-in (PDF; 316 K; Released 03-02-15)
  • Purchasing Contact: Kevin Sullivan (sull0198@umn.edu)

    Project # 22-888-14-2182: Arboretum - Hsaio-Ho Garden

  • Issue Date: March 2, 2015
  • Due Date: March 18, 2015
  • Request for Proposal (DOC; 348 K)
  • RFP Instructions, Requirements, and Rights (PDF; 281 K)
  • Prevailing Wage Rates (ZIP; 53 K)
  • Drawings (PDF; 9.3 M)
  • Project Manual (PDF; 1.5 M)
  • Geo Report (PDF; 2.1 M)
  • Purchasing Contact: Denis Larson (dpl@umn.edu)

    Design Advertisements

    The Design RFP and RFB documents are accessible below.
    Information is sorted by Project Number.

    Project # 01-000-15-1129B: Athletics Village Environmental Services - Phase II

  • Issue Date: March 3, 2015
  • Due Date: March 11, 2015
  • Request for Proposal (DOC; 112 K)
  • Phase I Environmental Site Assessment (PDF; 2.8 M)
  • Site Plan (PDF; 1.4 M)
  • Purchasing Contact: Kevin Sullivan (sull0198@umn.edu)

    Project # 01-027-15-1823: Twin Cities Meter/Relay/SCADA Improvements

  • Issue Date: February 6, 2015
  • Due Date: March 6, 2015
  • Request for Proposal (DOC; 349 K)
  • RFP Instructions, Requirements, and Rights (PDF; 273 K)
  • Drawings (ZIP; 346 K)
  • Addendum 1 (PDF; 66 K; Released 02-12-15)
  • Addendum 2 (PDF; 54 K; Released 02-13-15)
  • Pre-Proposal Meeting Sign-in (PDF; 244 K; Released 02-26-15)
  • Addendum 3 (ZIP; 2.4 M; Released 02-26-15)
  • Purchasing Contact: Chip Foster (foste048@umn.edu)

    Project # 03-523-15-1979: UMD Kirby Student Center ReRoof

  • Issue Date: February 9, 2015
  • Due Date: March 12, 2015
  • Request for Proposal (DOC; 329 K)
  • RFP Instructions, Requirements, and Rights (PDF; 281 K)
  • Pre-Proposal Meeting Sign-in (PDF; 44 K; Released 02-19-15)
  • Addendum 1 (ZIP; 8.5 M; Released 02-27-15)
  • Purchasing Contact: Denis Larson (dpl@umn.edu)

    Viewing Documents

    To view certain documents on the Construction Purchasing webpages, you must have Microsoft Word, Microsoft Excel, Acrobat Reader or WinZip programs.

    Questions or Concerns?

    If you are unable to open a document, have encountered a broken or incorrect link, or have any Construction Purchasing questions, please send us an email to request assistance.

    Construction Purchasing Quick Links

    Contractor Safety Information
    Department Documents
    Home Page
    Project Advertisements

    Project Archives
    Project Results
    State Designer Selection Board

    Vendor Registration